In Which the Pirate Spins With the Tour.
It was a slog to get through, but I finished the Rambouillet project one day before the Tour de Fleece began! This project has been languishing for five years; I spun the singles for the 2010 TdF and then let them sit and sit and sit. My plan had been to chain-ply, and then I realized that the singles didn’t have enough twist for that. I moved on to thinking I would just finish them as-is, as a lightly fulled laceweight. Then I realized that I’d never actually knit anything with that yarn, and that what I really needed to do was add some more twist and go back to the original plan. That’s what I did, and it’s come out to 268 yards of light fingering weight… though I still don’t know what I’ll make with it.
And then on Saturday, the Tour de France/Fleece began! My main project this year will be spinning for a sweater on the new Schacht-Reeves and plying on the Sonata’s jumbo bobbins, using several pounds of mystery wool roving that I got from my friend Josh a few years ago. I have four different natural colours, and I started with the lighter gray. I’m starting to get the hang of the longdraw, though some parts of the roving aren’t drafting as smoothly as others.
I had friends visiting for the long holiday weekend. On Sunday morning we watched part of Stage Two of the Tour with breakfast, then went out for a 12.5 mile bike ride in the hills. After everyone had gone home, I settled down to spin while watching 1776, one of my July 4th traditions (I was a day late, but that’s okay) and by the time I called it a night I was well into the third bobbin. I’m absolutely loving how the Woolee Winder just lets me spin and spin without fussing with hook changes, and the thicker yarn sure does spin up fast.